Project Description

Swimming Pool ~ Extension & Refurbishment

The Managing Director's brief for this two-phase project was to create a design to the newly constructed extension and redesign the existing changing facilities.

Both designs needed to take into consideration their main client base, parents with babies, toddlers and young children.

Working closely with the Managing Director, we created a layout that both maximised the use of space, whilst maintaining the ability for parents to manoeuvre easily with car seats and/or children.

The cubicle system needed to look good, be waterproof, hard wearing and resilient but also cost effective. Our Warrior Range was the perfect fit, with a wide variety of colours to choose from it made matching the clients branded colour scheme relatively easy.

Phase 1

  • Multiple family change cubicles, standard change cubicles and toilet cubicles.
  • Nappy change units with a storage shelf to allow for storage of changing bags and/or car seats. These were supplied with shaped privacy screens either side for added aesthetics.
  • Both wash and hair dryer vanities.

All products were manufactured from solid grade laminate, as per our Warrior Range. Waterproof, durable and dependable making it the perfect option for demanding high usage environments both wet and dry.

Installation on site was undertaken by the clients' own contractors.

Phase 1 - Delivered on time and on budget.

If you're interested in finding out what we can offer your project, please get in touch and we'll be happy to help.